www.ifw-net.com/awards

Ro-ro News

TTS to supply linkspan

Thu, 17 Dec 2009

Printer friendly version Email the editor Send to a friend
TTS Port Equipment has signed the contract to deliver an upper deck linkspan to be used in conjunction with two new Stena Line vessels at Harwich International Port in the UK. The new linkspan will serve Berth 2, facilitating double-deck operations and providing upper level access to the ro-pax ferries, each with the newly specified capacity to load and discharge vehicles from an upper deck over the bow.

“The TTS proposal comprises a new structure supported by dolphins which have been specified to maximise safety and stability, being completely separate from the existing pontoon”, said Håkan Jönsson, VP sales at TTS Port Equipment.

The entire ramp will operate as two parts, one adjustable and the other lifting. The adjustable portion will be elevated by means of hydraulic cylinders built into an arched support structure, while the free-floating lifting ramp will be hinged to the adjustable ramp and will rest on the vessel deck when deployed. There will also be modifications to the seaward nose of the existing pontoon to improve vehicle transitions.

TTS said the linkspan project will maximise the efficiency of the new Stena vessels, significantly reducing loading and unloading times. The vessels will be the world’s largest ro-pax ferries – at 240 metres long with 5,500 lane metres each – and have been built to increase the number of vehicles carried by more than 30%.

The linkspan installation is to be performed first half of 2010 and forms part of Harwich International Port’s multi-million pound investment in delivering upgraded facilities for ro-ro vessels.


advertisement
Buy the CI Yearbook 2010 now. Click here.